Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Ottawa building department at every stage.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Inspections built into the schedule, not an afterthought.
Change orders require your written approval.
A defined timeline with milestones, not open-ended.

Inspected before any finish work covers it up.
Signed off by a structural engineer when warranted.
We manage the timeline so it doesn't stall the project.
Installed to code once framing passes inspection.
Where a rebuild starts looking like a home again.
Certificate of occupancy coordinated with Ottawa inspectors.
A technician answers and lines up a structural evaluation.
Initial framing and load evaluation included.
You approve the plan and permits before construction.
Nothing closes out until final inspection passes.
"The framing repair passed inspection on the first try, which our contractor friend said doesn't always happen." — Homeowner, Ottawa
"Not dealing with the permitting office directly saved us a lot of stress." — Homeowner, Ottawa, IL
"We expected delays, but the rebuild finished close to the original timeline quoted." — Homeowner, Ottawa
Included as part of the standard scope.
Most projects run six to twelve weeks from permit to final inspection.
Yes, full GC licensing covers the entire rebuild scope.
Significant damage typically gets engineer review first.
Yes, we send documentation directly to your Ottawa, IL adjuster throughout.
Our Structural Rebuild teams cover Ottawa and the surrounding zip codes, with licensed GC oversight on every project.
